Deformation Behavior of Sanibey Dam Concrete Slab Joints

The 130.0 m high Sanibey Dam is located on Seyhan River in the southern part of Turkey. Construction of CFRD, concrete faced rockfill dam, was completed at the beginning of 2010 and full reservoir level was reached in 2011. The goal of this study is to present the prediction of joint movements to be expected during impounding, based on the observed settlements as monitored during construction for Sanibey Dam. For this purpose, first, the actual construction stages are modeled in finite element model according to the real construction schedule and then, material properties are obtained from back analysis of construction stage. Finally, instrumentation readings of impounding stage are compared with calculated joint displacement values and discussed.

Sanibey Dam and HEPP Project, owned by Yedigöze Electricity Production and Trading Co. Ltd. (Sanko Holding), is located on Seyhan River in Mediterranean region of Turkey. Hidro Dizayn (a group company of Lahmeyer International) prepared feasibility, final and detailed design of entire project and dam type is concluded as concrete faced rockfill dam considering geological, topographic and economic relevance. The dam is 130.0 m height from foundation and upstream-downstream slopes are assigned as 1.4H/ 1.0V and 1.47H/1.0V respectively. Plinth is decided to settled on competent rock in the middle of the valley and downstream part of the dam body is placed on 20.0 m thick alluvium after 5.0 m stripping excavation. Upstream concrete slabs are divided with vertical joints at every 15.0 m and thickness of the slabs varies 30 cm to 70 cm starting from the crest to foundation.In design stage of Sanibey Dam, three dimensional finite element model is constructed to examine the behavior of the dam during impounding. Although magnitudes of joint opening were acceptable for a CFRD type of dam, special precautions should be taken for the central joints under compression to avoid compression failure of slabs, as encountered in dams such as Compos Novos or Barra Grande. For this reason, vertical joints between five central slab are constructed as compressible joints by keeping neighboring slabs 4 cm away from each other and applying a seepage barrier on top similar to expansion joint detail.
Construction of Sanibey Dam fill is started at the beginning of 2009 and total of 3.7 million m³ filling works is completedby the end of January 2010. Impounding of reservoir is started after completion of concrete works in September 2010 and maximum operation water level is reached at the beginning of 2011. Although there some minor fluctuations in reservoir level, it is sustained until the end of 2013 which is the last date of available instrumentation data.



Copyright: © Springer Vieweg | Springer Fachmedien Wiesbaden GmbH
Quelle: Wasserwirtschaft 06/2016 (Juni 2016)
Seiten: 4
Preis inkl. MwSt.: € 10,90
Autor: Faruk Çetin
Uğur Akpınar

Artikel weiterleiten In den Warenkorb legen Artikel kommentieren


Diese Fachartikel könnten Sie auch interessieren:

Planning and Design of Kemah Arch Dam in a Very Strong Seismic Region
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (6/2016)
The Kemah arch dam is situated in Turkey close to the Eurasian Seismic Zone, where the peak ground acceleration of a 2 500-year earthquake reaches to a value of 0.70g. In this paper, the planning and design of the arch dam are reported besides presentation of main features of the project. Based on the results of geological and geotechnical investigation including the karstic foundation, shape of the arch dam was optimized using the time-history approach to cope with the extraordinary seismic loading, and the stresses in the arch dam and foundation were analysed in each time step. Based on the determined tensile and compressive stresses, the required concrete classes were accordingly defined.

Trag- und Verformungsverhalten einer 100-jährigen Gewichtsstaumauer
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (6/2016)
Standsicherheitsberechnungen für bestehende Staumauern erfolgen heute auf der Basis der Finiten-Element-Methode unter Beachtung des nichtlinearen Materialverhaltens. Vorgestellt werden Ergebnisse einer solchen statischen Analyse an der über 100 Jahre alten Eder-Staumauer. Neben den Untersuchungen zum Nachweis des normenseitig geforderten, rechnerischen Standsicherheitsniveaus werden auch das Verhalten unter Gebrauchslasten und die Simulation der Bruchzustände beschrieben. Es erfolgt eine Gegenüberstellung mit Verformungswerten geodätischer Präzisionsmessungen.

Das neue Dichtungs- und Kontrollsystem am Sylvensteinspeicher
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (6/2016)
Der Sylvensteinspeicher wurde in den Jahren 2011 bis 2015 nach über 50-jähriger Betriebszeit durch eine zusätzliche Dichtwand im bestehenden Damm und Untergrund sowie mit einem neuen Sickerwasser-Messsystem – bestehend aus Dränagepfählen und einem Kontrollstollen – an den heutigen Stand der Technik angepasst. Diese Ertüchtigungsmaßnahmen sind auch Vorsorge gegen die Folgen möglicher Klimaveränderungen und die damit verbundene stärkere Beanspruchung der Talsperre. Die Baumaßnahmen mit Gesamtkosten von rund 23 Mio. € wurden aus dem Europäischen Fonds für Regionale Entwicklung (EFRE) kofinanziert.

Das INTERREG-IV-B-Projekt LABEL – Anpassung an das Hochwasserrisiko im LABE-ELBE-Einzugsgebiet
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (11/2010)
Ein zentrales Anliegen der EG-Hochwasserrisikomanagement-Richtlinie (HWMR-RL) ist eine ganzheitliche Betrachtung der Einzugsgebiete in Bezug auf das Hochwasserrisikomanagement (HWRM). Ergänzend zur formalen Koordination durch die IKSE und um die tägliche internationale Zusammenarbeit der beteiligten Behörden zu verbessern, arbeiten alle regionalen Behörden des Elbeeinzugsgebietes in dem Projekt LABEL zusammen. Dieses wird teilfinanziert durch das EU-Förderprogramm INTERREG-IV-B-Zentraleuropa. Innerhalb des Projektes erarbeiten 20 Organisationen aus Deutschland, Tschechien, Österreich und Ungarn gemeinsam Risikobewertungen und Anpassungsmaßnahmen.

Erarbeitung von Hochwasserrisikokarten in Rheinland-Pfalz
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (11/2010)
Auf Grundlage der LAWA-Empfehlungen zur Aufstellung von Hochwassergefahrenkarten und Hochwasserrisikokarten und der landesweit vorliegenden Hochwassergefahrenkarten werden in Rheinland-Pfalz zurzeit die Hochwasserrisikokarten in einem Gesamtprojekt erstellt. Damit wird bis Ende 2010 die zweite Stufe der Umsetzung der europäischen Hochwasserrisikomanagement- Richtlinie abgeschlossen sein. Die Karten werden über das GeoPortal Wasser des Landes Rheinland-Pfalz veröffentlicht und in den geplanten Hochwasserpartnerschaften der Flusseinzugsgebiete vorgestellt.

Name:

Passwort:

 Angemeldet bleiben

Passwort vergessen?